Welcome to the Van Buren Street Corridor Online Workshop

Hi, we’re glad you’re here!

How to Participate

Please review each slide to learn more about the corridor.

BRT 101

BRT - What You Need to Know

Phoenix voters approved Transportation 2050, a 35-year citywide transportation plan, which included Bus Rapid Transit (BRT). BRT is a high-capacity bus service that provides a fast, reliable, and convenient transit experience that’s coming to Phoenix! A BRT system is unique because it can be planned and designed to best meet the needs of the community.

BRT Elements

These elements are commonly found in successful BRT systems and will be included in Phoenix’s first BRT corridor.

Frequent service

Enhanced bus stations

Transit spot improvement

Dedicated lanes

New, larger buses

Level boarding

All door boarding

Enhanced fare collection system

Increased reliability

Overview

The City of Phoenix BRT Program is moving forward!

The first corridor has been approved on 35th Avenue and Van Buren Street. In Spring 2025, outreach efforts focused on 35th Avenue between Van Buren Street and Cheryl Drive. Through extensive outreach to community members, council members, and elected officials, center-running BRT was selected for 35th Avenue and 15% design is underway.

Now we need your input on selecting a BRT lane option along the Van Buren Street Corridor. Between 35th Avenue and 7th Avenue, there are two lane options, one with dedicated bus lanes in the curb lane (side-running) and one with dedicated bus lanes in the center of the road (center-running).

This is a map showing the 35th Avenue BRT Corridor, starting at Van Buren Street and heading north along 35th Avenue to the Thelda Williams Transit Center, including 11 proposed stations.

Our Process

Where we are...

In fall 2025, we will be focusing on the Van Buren Street portion of the corridor, finalizing the preferred lane option to continue moving the project forward into design.

This is a timeline highlighting four phases of the BRT Project and when they take place. Phase I, Transit Analysis took place from Spring 2020 to Spring 2022. Currently, the City of Phoenix is in the second phase which is the Detailed Corridor Planning Phase that will last until Fall 2026, followed by the Final Design Phase from 2026 to 2028 and the Final Construction Phase set to begin in Fall 2028. Construction is expected to conclude in 2030.

7th Ave. to Central Ave.

The section of the Van Buren Street Corridor between 7th Avenue and Central Avenue (shown in dark blue in the map below) will incorporate mixed-running BRT due to limited roadway width, existing building infrastructure, and right-of-way impacts. Mixed-running means the BRT buses will operate in the same traffic lanes as regular cars and other vehicles.

Map of Van Buren Street between 35th Avenue and Greg Stanton Central Station

Lane Option A: Side-Running BRT

Lane configuration for side-running BRT along Van Buren Street at a signalized intersection where BRT stations are proposed.

The "VanBuren-7th-Side_w_EnglishCC-02" content is not embedded in this static copy.
Click here for Spanish version
The "Phoenix Side Run-ning BRT Potential Concept (Español)" content is not embedded in this static copy.

Considerations

  1. Dedicated BRT Lane Use:
    Local buses can use the BRT lane and general traffic can make right-turns from the BRT lane

  2. Roadway Width:
    Requires more road width

  3. Pedestrian Access:
    Station access is on the sidewalks, creating longer pedestrian crossings through intersections

  4. Right-of-Way Impacts:
    More potential right-of-way impacts to residences and businesses

  5. Travel Time:
    Slower travel times and less reliable due to impacts from right-turning general traffic and local bus

  6. Left-Turn Movements/Access:
    Drivers can make left-turns throughout the corridor

Lane Option B: Center-Running BRT

Lane configuration for center-running BRT along Van Buren Street at a signalized intersection where BRT stations are proposed.

The "VanBuren-7th-Center_w_EnglishCC-02" content is not embedded in this static copy.
Click here for Spanish version
The "Phoenix Center Running BRT Potential Concept (Español)" content is not embedded in this static copy.

Considerations

  1. Dedicated BRT Lane Use:
    Only BRT buses are allowed in the BRT lane

  2. Roadway Width:
    Requires less road width

  3. Pedestrian Access:
    Station access is in the center of the road, creating shorter pedestrian crossings through intersections

  4. Right-of-Way Impacts:
    Less potential right-of-way impacts to residences and businesses

  5. Travel Time:
    Faster travel times and more reliable due to the elimination of general traffic impacts

  6. Left-Turn Movements/Access:
    Drivers can only make left-turns at signalized intersections throughout the corridor, due to bus traveling in the center of the road

Side-Running vs. Center-Running

Lane Options

The chart below compares the considerations for each lane option.

Consideration Lane Option A: Side-Running BRT Lane Option B: Center-Running BRT
Dedicated BRT Lane Use Local buses can use the BRT lane and general traffic can make right-turns from the BRT lane Only BRT buses are allowed in the BRT lane
Roadway Width Requires more road width Requires less road width
Pedestrian Access Station access is on the sidewalks, creating longer pedestrian crossings through intersections Station access is in the center of the road, creating shorter pedestrian crossings through intersections
Right-of-Way Impacts More potential right-of-way impacts to residences and businesses Less potential right-of-way impacts to residences and businesses
Travel Time Slower travel times and less reliable due to impacts from right-turning general traffic and local bus Faster travel times and more reliable due to the elimination of general traffic impacts
Left-Turn Movements/Access Drivers can make left-turns throughout the corridor Drivers can only make left-turns at signalized intersections throughout the corridor, due to bus traveling in the center of the road

35th Ave. to 7th Ave.

There are multiple projects that impact the Van Buren Street Corridor and will be considered when determining the BRT lane options. The BRT project team will continue to collaborate with various agencies and projects throughout the design of the corridor.

The Van Buren Street BRT lane options between 35th Avenue and 7th Avenue will need to consider other potential improvements in the area, including:

  • ADOT I-17 freeway crossing improvements
  • Improvements at the ground-level crossing of the BNSF Railway, west of 19th Avenue
  • Valley Metro I-10 West Extension light rail alignment on Van Buren Street east of I-17
  • Improvements to the 7th Avenue/Grand Avenue/Van Buren Street intersection
Map of Van Buren Street

Comment Map

The "Interactive Route Map" content is not embedded in this static copy.

Survey

The survey form is not available in this static copy.

Thank you!

Thank you for attending our online open house!

Contact the project team

The comment form is not available in this static copy.